Today marks five weeks since the May 22 fire at Hale Library. In this update, we have a lot to share about our demolition progress.
A huge amount of damaged drop ceiling, drywall and carpet has been removed.
Ceilings
Walls
There was also extensive water damage to the drywall. In some areas, only a few feet needed to be removed, but in other parts, the entire wall had to be demolished and only metal studs remain.
Furniture and technology: Soot damage
Most of the furniture in the building was damaged beyond repair and will need to be thrown away. The tables that were located across all five floors of the building suffered so much smoke damage that the toxic soot cannot be cleaned off of them.
Already, the majority of the furniture from the first through the third floors has been disposed of. All told, it filled a large industrial dumpster 65 times.
Because the soot from the smoke is so toxic, every inch of ductwork in the 550,000-square-foot building will need to be taken down and professionally cleaned.
In addition to the ductwork, all surfaces of every room will have to be professionally cleaned to eliminate the soot. Cleaning the first through fourth floors could take about ten weeks.
Furniture: Water damage
The original Farrell library tables suffered intense water damage that stripped and warped the wood beyond repair. These photos were taken two days after the May 22 fire.
Book Retrieval
Luckily, not everything was completely unsalvageable. While removing books, the crew and staff were in desperate need of book carts and were able to salvage 30 book carts from the fifth floor.
Progress continues on the book retrieval process. At this point, 30,000 full boxes of books have been removed.
Technology
In the last week, the data center, which had been operating off of generators, was returned to commercial power.
Additionally, the electronics in the building have been assessed, and about 70 percent of what was deemed a loss has been prepared for disposal through the e-waste process.
Obviously, there are many moving parts to the recovery process. Before we can implement our plans for K-State’s future Hale Library, the damaged portions of the building must cleared out. We are making strides forward every day.
We’d like to extend our deep appreciation to our K-State Libraries and Information Technology coworkers and the Belfor team for everything they’ve accomplished thus far.