Kansas State University

search

Hale Library Blog

Month: September 2018

Cleaning house: Week eighteen update

We’ve witnessed a lot of things go down on the fourth floor of Hale Library over the years: students camping under tables with blankets and pillows during finals week; physical anthropology study sessions that featured skeletons and piles of bones; and, well, let’s be honest, we’ve seen some fourth-floor stacks activities we wish we hadn’t.

But we’ve never seen fourth floor as a woodworking shop … until now. A lot of materials — like the entire physical library collection and one of the murals — have been packed out so they can be cleaned and stored until Hale Library renovations are complete.

Dozens of unvarnished, clean wooden beams of different shapes are arrayed on the floor.
Clean wooden beams from the Great Room ceiling fill Hale Library’s fourth floor. 

The Great Room woodwork is staying, though. Crews are cleaning and stripping the beams. Eventually, they’ll be refinished, and when the roof and ceiling are repaired and the space is ready for renovation, the beams will be reinstalled.

The fourth floor woodworking space is walled off with plastic.

Two workers wearing white t-shirts and hard hats stand next to heavy pieces of wood resting on sawhorses.Crew members from John Canning Co. clean and remove varnish from two decorative arch braces that hung in the Great Room. 

A dark-haired man in a white t-shirt and hardhat uses a cloth to wipe a heavy piece of wood sitting on sawhorses.
A worker from John Canning Co. cleans a piece of Great Room woodwork.
Another worker applies stripper to remove coats of old varnish.

Meanwhile, back in the Great Room, conservators continue to monitor and stabilize the David Hicks Overmyer murals.

At left, a worker in a white hard hat stands elevated on a rough wood floor supported by scaffolding. An allegorical mural depicting the arts is to his right.
John Canning staff members have cleaned the murals, removed the damaged layer of varnish, stabilized areas of paint and applied a new layer of varnish.
In a close-up, shadowy view, a woman in a white hard hat and yellow construction best holds an iPad. The handle of a mallet is visible tucked under her right arm.
Julia Manglitz, an architect from TreanorHL Historic Preservation, stands on one of the ledges supported by scaffolding in the Great Room. She explained to us how she tests the condition of the plaster by “sounding,” or tapping the wall with a mallet and listening for how hollow it seems.
A woman's torso and arms are visible; she holds an iPad with a line drawing of the Great Room wall on it in her left hand and points at it with a stylus in her right hand.
Once she’s tested the plaster through sounding, Manglitz creates a visual map of the condition of the wall on her iPad. She reports that many sections are still very wet. (In fact, on the two floors below the Great Room, the moisture level in some of the plaster and stone walls is as high as 80 percent.)
An art deco style painting of a figure with curling brown hair
A figure from the “Arts” mural is covered in white spots of thermoplastic adhesive, which is used to stabilize flaking paint. 

Additional mural restoration is on hold until two things happen: First, the plaster walls need to be more thoroughly dried out, and second, the rest of the Great Room restoration needs to be more advanced so that the murals aren’t re-damaged during that process.

In a room filled with scaffolding, large rectangles of gray fabric cover the murals on the wall. To prevent the murals from getting damaged while the rest of the Great Room is renovated, conservators have covered them with a felt-like fabric that’s attached to a tack strip that runs around the perimeter of each painting.

In the temporary “dance floor” space above the murals (which are barely visible at right), the roof joists are exposed. 

Up above the murals, the Great Room’s decorative woodwork has been removed, and the ceiling has been completely torn out. Crews from Hutton Construction are moving in to start replacing the roof and ceiling in the 1927 building.

Elsewhere in Hale Library, most of the recent action has centered on cleaning toxic soot from all surfaces and scraping up the carpet glue. Since that process is nearly complete, the size of the Belfor Property Restoration crew has been scaled down.

Metal scaffolding extends down a four-story stairwell.
Your daily dose of vertigo is brought to you by the scaffolding in Hale Library’s southeast stairwell, where they recently cleaned walls, railings, light fixtures and the ceilings.
Eight workers in hard hats and yellow construction vests are stationed across the entire length of the floor wielding long-handled scraping tools.
The process of scraping carpet glue on Hale Library’s third floor was a lot labor intensive and a little gross and sticky.  
Library or roller rink? After the glue was scraped off, the concrete and tile floors were cleaned and polished.

Even though the Belfor folks are starting to leave Manhattan, they aren’t taking a break: As organizations across the Carolinas assess the devastation wrought by Hurricane Florence, Belfor will be on the ground with their massive semi-truck command center and their amazing people. We wish them a safe assignment as they begin recovery efforts there.

It’s been eighteen weeks of damage assessment and drying out, packing collections and planning. The space is a clean slate, and in forthcoming posts we’ll be able share a lot more about the Hale Library of the future.

Exploring alternative study spots with Brenna

Hi! My name is Brenna. I’m a junior from Conway Springs, Kan., majoring in English. I was hired as a communications student employee for K-State Libraries about two weeks before Hale caught on fire, and as someone who basically lived in the library last semester, I was pretty upset when I heard what had happened, especially when I realized the extent of the damage. 

Selfie of the author.
This is me, looking a little sleep-deprived at work.

The K-State Student Union has stepped up in amazing ways, especially by hosting Library Help and IT Help desks. Everyone knows about it as a study spot, though. I decided to take a mini-tour to see what other study locations around campus are my favorite! Here are a few out-of-the-way areas you might not know about. 

I used the “Hale recovery” tab on the K-State interactive map to find locations that would be good on-campus study spots. The map itself was incredibly helpful since it has the hours listed as well as the room numbers or floors.

My first stop was Calvin Hall’s third floor, which is advertised on the map as a location with group study space, printing capabilities and a computer lab. The group study spot was extremely comfortable with rows of cushioned chairs and a pretty relaxed atmosphere.

The very nice grad student who I talked to said that it’s typically pretty empty, except for right before class starts. 

There is also a charging station with both Android and iPhone compatible cords for those days when you find yourself without a charger. You can also find a  computer lab with a printer in Room 318.

A charging station on a black metal post with adapters hanging from it.
Charging station with cords for Androids and iPhones in Calvin Hall.
A man in a baseball cap holding a laptop sits on a couch.
Friendly Calvin Hall grad student.

Eisenhower Hall 121 was the next place I visited. This room is a designated quiet room, and it had a lot of outlets surrounding the desks, which is always a plus. There was no one there at all, and it was really easy to find.

There is a chalkboard there if that helps you study. Unfortunately, there is no printing in Eisenhower for students, so plan accordingly!

Several white plastic tables and aqua chairs sit in front of a large, sunny bank of windows.
Tables in Eisenhower 121, a quiet study room.

The College of Business Building is home to some amazing study spaces. Rooms are available for both quiet study and group study. Even the open study spaces on the first, second and third floors were relatively quiet.

The very friendly student I talked to said that the areas are generally heavily trafficked and that it can be difficult to grab a study room.

However, there were so many different seating options and arrangements outside of study rooms. Nearly all of the chairs I saw also had desks near them. Printers are available, and they are located near the first, second and third floor elevators and in the back of the computer lab located in Room 3121.

A student with short dark hair sits in an armchair holding a black laptop in front of a light purple wall.
Seating options in the College of Business Building.
A student with long brown hair and glasses smiles at the camera as she sits in an office chair with her feet propped up on an armchair and holds her laptop.
Study room in the College of Business Building. 
More than two dozen double computer monitors line long wooden tables in a room occupied by a single student.
The computer lab in the College of Business Building, Room 3121.

Next up, Justin Hall! Justin Hall has a quiet study room (Room 301) on the third floor and group study locations on the first floor in an open area.

A computer and large printer sit under a sign that says "Louis S. and Rachel C. Hodgson Student Collaborative Area."
The printer in Justin Hall, which is located by the group study area.

Right by the entrance to Justin, there are tables with chairs for groups, and farther back in the first floor is another group of comfortable chairs—these do not have desks, but it was quite a bit quieter than the area by the entrance. Printers are available both in the quiet study room and in the group study location to the left of the main entrance.

Brenna sits in an armchair against the left wall; nearby, two tables are surrounded by a variety of office chairs.
Quiet study in 301 Justin.

Dickens Hall has 24/7 printing available! It is a computer lab, so it has a lot of computers and a printer available. They’re located in Room 1, which is in the basement. You can access it through the back entrance on the north side of the building or the wheelchair accessible entrance throughout the night.

A dozen monitors sit on three tables lined against a wall.
Rows of computers in the basement of Dickens Hall lab.
Three students with short hair hold notebooks and pens as they look at a computer monitor together.
The computer lab in Dickens Hall. 
Wheelchair accessible entrance to the computer lab in Dickens Hall.

The Vet Med Library is located on the north side of campus in Trotter Hall, very close to the K-State Rec. Its amazing booths might just be worth the trek. It’s open 8:00 a.m. to 5:00 p.m. and has public computers, scanners and a printer.

The printer does cost a small amount because it doesn’t accept CatCash. There is an open group study area as well as a room specifically for quiet study, Room 422.

It is located on the fourth floor of Trotter Hall and is to your right when you get off the elevators. The chairs are comfy, and there is a variety of seating arrangements, including those booths—they’re now my favorite spot because they have outlets on the table and are incredibly comfortable.

Entrance to the Vet Med Library on the fourth floor.
A curved help desk at the left is adjacent to a study area with tables and office chairs, as well a variety of soft seating.
Group seating in the Vet Med Library.
Wooden tables and gray booths with an aqua pattern line one wall of the Vet Med Library. A student at a laptop works in the distance.
Booths in the Vet Med Library.

I found a ton of study spots that I did not know existed before this year, and some of them I really loved. If you’re like me, you’re missing Hale Library, but there are great spots out there. Go find your new favorite spot—and let us know about it!

Recovery momentum and magical spaces

We have only shared a small percentage of the thousands of photos that have been taken of Hale Library since May 22. This week we wanted to share a few more that are meaningful to us. Some are powerful illustrations of the reality of the devastation inside the building; others show how far we’ve come in the recovery process.

We’ve also included a few that are laden with memories and our hope for the future of Hale Library.

Here’s looking at you, Hale: A drone’s eye view of the building taken after the fire gives a sense of the phases of construction over the years. Historic Farrell Library (1927) is at the upper left. The white square inside the red circle is a temporary roof that covers areas damaged in the fire. June 21, 2018. 

There’s one aspect of the recovery that’s hard to get across in these blog posts: It’s dark in there! We share photos that are as well-lit as possible, but in those instances, the light source isn’t Hale Library’s lights; they’re either natural light from the windows or temporary lighting.

An alcove on the first floor, south side of Hale Library. June 11, 2018. 

The electrical infrastructure was seriously compromised, so the building is operating off of temporary construction power supplied by portable units rather than “house power.” As soon as you walk away from a space that’s lit up with construction lights … you’re in the dark. More than once the power has gone out on the workers removing the books from the stacks.

Now imagine that you’re working in here, and those light bulbs go out. August 13, 2018. 

Fortunately, the building is nearly empty now. We’ve come a long way in the last sixteen weeks. The majority of the collection has been packed out, the duct work is completely clean, and the process of removing soot from all other hard surfaces is nearly complete.

Our services have been successfully relocated, too.

The reserves collection surrounded by water pooling on the carpet. May 24, 2018. 

The reserves collection, which includes a lot of textbooks, was located behind Library Help on the second floor. Now students can access reserves at branch libraries and the new Library Help Desk at the K-State Student Union.

IT computers sit in puddles of water in a cubicle on Hale Library’s second floor directly below the Great Room. May 24, 2018. 

These days, the IT Help Desk is up and running in the Cat’s Pause Lounge on the top floor of K-State Student Union.

And those two sodden and sad locations in the photos above? They’re awaiting their next act!

The second floor office area is clean and empty; at rear of photo, the reserves shelving is wrapped in plastic. September 5, 2018. 
Room 212, former home of IT Services, is a blank canvas. August 10, 2018. 

The Harry Potter Room.

If you’ve been on campus since the first Potter film came out in 2001, you probably know what we’re talking about. The Great Room has inspired comparisons to the Great Hall in the Harry Potter movies for nearly two decades. More than one student has said that just being there made them feel smarter and more focused.

Post-fire, it looked as if the Harry Potter Room had a brush with some dark magic.

Charred building material hangs out of a hole in the Great Room ceiling.
A hole in the Great Room ceiling from a wand misfire? Nope, it’s from  fire. July 20, 2018. 
A view of the Great Room taken from above shows a dozen massive, warped wooden tables stand in puddles of water.
Water pooling across the floor, warped tables. May 24, 2018.
A heavy oak acorn finial lies cracked on the floor.
This Hagrid-sized acorn fell from the ceiling. Now, most of the woodwork has been deinstalled (in a much more deliberate and careful manner). It will be refinished prior to reinstallation. August 6, 2018. 

These days, it’s gratifying to see the space wiped clean and buzzing with activity. We’re moving forward, and the team of conservators, architects, construction workers and craftspeople executing the recovery and restoration plan are wizards at what they do.

A worker removed paint from a plaster capital to allow water to evaporate from the walls more quickly. July 20, 2018. 
A worker at left removes paint from a pilaster to speed the drying process. At center, a conservation specialist examines fragile portions of the “Arts” mural. July 20, 2018. 
Belfor workers make their way from the first floor to second. Since this photo was taken, the wooden display cases to the right and left of the second floor entrance have been removed. June 11, 2018. 

Here’s a less-known Potter-themed room for any die-hard fans out there. Room 117 on Hale Library’s ground floor was not a well-trafficked space. It was home to rows and rows of moveable compact shelving.

The bulk of the collection that experienced water damage was located in Room 117. Fortunately, most was deemed salvageable. May 25, 2018. 

Those who took time to uncover the library’s secrets, though, were aware that Room 117 was generally cooler when the rest of the building was hot, warmer when the rest of the building was cold, nearly always quiet and usually had vacant tables next to some enormous banks of windows. No space in the library, save perhaps the Great Room, offered more beautiful natural light.

The shelving is gone and Room 117 stands empty. August 24, 2018. 
Another view of Room 117 facing west toward the English Department Building. August 24, 2018. 

How is all of this Potter-themed?

A few of our student employees dubbed it “The Room of Requirement.” It always had what you needed. We can’t wait to see what need the Room of Requirement—and all of these now-empty spaces—fills in its next life.

Week Fifteen Update: A ton of Jenga fun and other developments

Librarians are pretty obsessive about tracking everything in their collections. It’s all meticulously cataloged, which allows us to identify where each item is at any given point in time, who has it, and when it’s coming back.

Cataloguing pieces of a mural? The oak beams from the Great Room? A 50-pound solid oak acorn finial? That’s a little out of our wheelhouse.

The wooden acorn finials (shown on the cart at right wrapped in a green protective covering) weigh 50 pounds each.

Fortunately, John Canning Company is in charge of disassembling Historic Farrell Library so it can be put back together better than ever. We’re confident that there will be no Humpty Dumpty situations on their watch.

Let’s set the scene: There’s a coupla big ol’ holes in Farrell Library. Charred, scary holes that have been covered by a temporary roof.

Until recently, it was difficult to get up close and personal with the ceiling to photograph the fire damage.

Below that, you have the dance floor. That’s what they call the temporary plywood floor built on top of the metal scaffolding that fills the entire Great Room. We don’t want to keep those holes, so the dance floor gives workers access to the ceiling where they can begin the process of removing the fire debris to replace the ceiling and roof.

Wooden beams that will be preserved are laid out on the “dance floor.” Every piece is labeled so that once the room has been renovated, it will be possible to reassemble the woodwork.

Workers are carefully taking down the woodwork that lends the Great Room much of its historic character. It’s a little like high-stakes Jenga: Removing, labeling and relocating each piece of wood is a delicate process.

In order to keep the ceiling repair process moving forward, workers have to take each piece of wood off of the dance floor. Here you can see the scaffolding that supports the floor. 

When Farrell Library is sporting a new ceiling and roof sans holes, it will be time to reverse-Jenga all of that woodwork. We can’t wait to see it back where it belongs!

The ceiling has been removed already in this portion of the Great Room, and the rest of the beams will follow.

Over in the Richard L. D. & Marjorie J. Morse Department of Special Collections, librarians have been going hands-on to pack out the Libraries’ unique research collections and rare materials. This area of the building mainly experienced smoke damage, and we initially hoped the books and other holdings could be cleaned on site. It’s become clear, though, that in order to keep them safe, everything needs to be transported to secure, reliably conditioned space.

“We should have everything out before the end of September,” said Associate Dean of Libraries Mike Haddock. “It’s been a slow process, but we can finally see the light at the end of the tunnel.”

Only a few rooms of special collections materials remain in Hale Library. They’re the last of more than 1.5 million items to leave the building and go into storage where they will be professionally cleaned.

The remaining special collections materials will join the 140,000 boxes that have already been sent to one of the three offsite storage facilities we’ve contracted to keep everything safe. The newest location in our stable of stables is one of Underground Archive & Storage’s facilities, a former limestone mine in Kansas City, Mo.

Underground Archive & Storage has facilities across the region; the one we’re using occupies a series of caves created by limestone mining. Given that Hale Library is a massive limestone construction, we think there’s a metaphor here. We’ll let you know when we figure it out.

Now, it might not have been the first thing on everyone’s mind after the fire, but we had materials on order that arrived over the summer. We were a little busy, and we weren’t able to make those available … until now!

NEW K-State Libraries materials that were destined for Hale Library are being held in Seaton Hall. You can visit Library Help in the Union and ask for the item you want in person; we’ll retrieve it on the spot. Alternately, you can make your request through our website and specify which library help desk you’d like to pick your item up at.

And, as we look to the future, we continue our work with the architects from PGAV. They recently completed “like-for-like drawings”: PGAV determined what the building looked like right before the fire. Now those drawings go to a contractor who assigns what the replacement costs would be if we were to rebuild Hale Library as it was. These are essential steps that have to happen before the various parties involved assign a dollar amount to the total damages. Only after that is completed will we know how much K-State will receive from the insurance companies.

A group of six librarians and architects sit and stand around a table as one of them points to a print out of a floor plan.
While we wait for information about total damages and insurance, staff are working with PGAV to imagine a library for K-State’s future.

Until then, if you ever have questions you’d like us to address in this blog, please comment below or contact us at libcomm@ksu.edu.

And to everyone who has been following along with us on this journey, thank you! Your comments and words of encouragement mean the world to us!