On the job site with Hutton Construction

The Dave & Ellie Everitt Learning Commons opens in fall 2019. We’re so excited, we’ve done everything we can short of scaling Anderson Hall to shout it from the rooftop spire. This week we talked to the Hutton Construction superintendents in charge of making it happen.

At center left, two men wearing hard hats stand in a construction site next to a concrete pillar.
Mike Watkins and Curt Miller, Hutton Construction superintendents, on Hale Library’s first floor. April 23, 2019. 

Mike Watkins has been in construction for 17 years, including a stints working for a general contractor and as an iron worker. This isn’t his first time on the K-State campus: He worked on the Justin Hall renovation and addition in 2011.

A large group of students wearing white hardhats gather around a long table to look at construction plans and listen to the site superintendent.
Watkins speaks to the Illuminating Engineering Society about the Hale Library renovation project. The group took a tour of the building this week. April 23, 2019.

Curt Miller has been working in the construction field a bit longer.

“I started parking cars when I was 16 for $1.60 an hour,” Miller said. “Then I got a job working on a bridge deck wielding a 90 pound jackhammer. That paid $3.20 an hour.”

One day while he was on the job, Miller said he saw the man on the job site sitting in a pickup and told his coworkers, “I want that guy’s job.”

A man wearing glasses and a white hardhat stands on a construction site next to a stack of red metal pipes leaning on a concrete pillar.
Miller says the historical preservation elements of the Hale Library project appeal to him. At one time, he owned a contracting business specializing in historic renovations. April 23, 2019. 

He was superintendent on a small project by the time he was 21.

Both say that most of the jobs they work on are new construction and remodels; they don’t often work on buildings after a disaster. Because of the fire, the Hale Library project has required them to deal with a lot more remediation than they normally would. They’re used to dealing with asbestos, but in Hale Library they’ve had to remediate old lead paint, plus smoke and soot contaminants, too.

Of course, not all jobs are this large, either. In order to manage work throughout the 400,000-plus square feet, they have a third short-term superintendent, plus five foremen who report directly to them. Additionally, there are approximately seven or eight sub-contractors and as many as 100 workers in Hale Library on any given day.

A construction worker wearing a red hardhat and yellow t-shirt stands behind a yellow mini excavator in a large rectangular doorway. A construction worker uses a remote-controlled mini excavator with a jackhammer attachment to tear out concrete on the first floor. April 23, 2019. 

“It’s a big job,” Miller said. “But I think we have a pretty good team dynamic.”

They say that the penthouse that covers the new roof-top HVAC units has been the biggest challenge so far.

“We had to build a roof over the old roof to protect the library’s fourth floor from the weather,” Watkins said. “Then we removed the old roof and installed the floor. In a normal job, you’d start from the ground up.”

While Hale Library’s users might not find the mechanical room an exciting part of the renovation, the process of watching it come together has been fascinating.

The timeline to get the first floor done by fall 2019 is also challenging.

A typical remodel would have more time built into the front-end for the design process. With the Hale Library renovation, the schedule is compressed, and plans are evolving constantly. It requires the superintendents and their teams to remain flexible and patient.

Watkins also said it will be critical to get the “smarts and parts” in time in order to get them installed and meet the deadline.

“Those are the things like technology—and there’s going to be a lot of it on the first floor—or door handles and other fixtures that don’t get manufactured until the order is placed,” he said.

What are some of the things coming up that Watkins and Miller say we should be looking forward to?

In the distance, a construction worker in a blue hard hat and white t-shirt operates a jackhammer. A worker jackhammers out damaged tile in the first floor sunflower entryway. April 15, 2019. 

They’re almost done with the first floor demolition, and then the framing will get underway.

They’re also working hard to get the rooftop air handlers online by May 1. Once they’re in the penthouse and functioning, they’ll help keep Farrell Library cool this summer. It will also help with air flow through the oldest parts of the building where they are working to lower the humidity and dry out the plaster.

While we were visiting with Watkins and Miller, we ran into K-State Student Ambassadors Tel Wittmer and Maddy Mash taking their own Hale Library tour, and we asked them what they thought.

A woman with long dark hair and a tall blond man wear white hardhats and pose on a flat rooftop.
Maddy Mash and Tel Wittmer on the roof of Hale Library withe the spire of Anderson Hall in the background. April 23, 2019.

“I think students are going to love all of the different types of study spaces,” Mash said. “And it will be great to have more natural light. That’s really exciting, too.”

Mash and Wittmer will be traveling across Kansas this year to talk about everything K-State, and now they’re prepared to answer questions about Hale Library.

If our readers have any questions for us or for Hutton Construction superintendents Mike Watson and Curt Miller, leave them in the comments!

 

Preview Hale Library’s transformation

Today’s Hale Library is cavernous, dimly lit, dusty and loud. Showers of sparks fly as work crews weld new pipes in place. A jackhammer clanks and stutters as they remove damaged entryway tiles.

Tomorrow’s Hale Library? It will be welcoming, well-lit and comfortable.

Having a hard time picturing it? Maybe this will help:

Right now on the first floor, workers on aerial lifts install new pipes and duct work. Metal studs cover the limestone facade of the 1955 stacks addition.

But when the Dave & Ellie Everitt Learning Commons opens on Hale Library’s first floor in fall 2019, this wall will be partially covered by white board surfaces, offering plenty of room for students to study and collaborate.

Sections of the limestone will remain uncovered, though. It’s one of the many ways the renovated Hale Library will deliver new, needed amenities for students while honoring the building’s long history.

We can picture it already–the return of the marathon white board study sesh:

Students take a break from studying for their Human Body final, December 2017.

And students will be able to access those white boards at all hours of the day because–drumroll please!–the Dave and Ellie Everitt Learning Commons will be open 24/7.

We’ll be able to close the first floor off from the rest of the building so that students can have the study space they need when they need it–even if that’s at 3:00 a.m.

Damaged sections of drywall have been removed from the old white board study area on second floor, and it’s ready for a revamp. April 15, 2019. 

When the second floor opens in spring 2020, it will feature a similar white board wall.

The first and second floors of the 1927 building, Historic Farrell Library, will open during one of the last phases. When they do open, though, the amazing natural light and plaster work will take center stage.

Previously, few Wildcats ventured into these rooms as they were densely packed with collections and office cubicles.

In the renovation, they’ll be transformed into public gathering spots. The second floor (shown above) will feature current periodicals and plenty of comfortable seating.

The second floor of Historic Farrell Library has been cleaned out and is ready for its rebirth as our campus’s new living room. Previously, it was home to staff cubicles. April 15, 2019. 
Wood salvaged from Historic Farrell Library sits on the first floor of the 1927 building. It will be reused throughout the renovated Hale Library. April 15, 2019. 

Directly below that living room space, the first floor of the 1927 building will include the same comfortable seating plus juvenile literature and curriculum materials, some of our highest use collections.

And for those of you wondering about food and drink options, rest assured that the Dave & Ellie Everitt Learning Commons will include an exciting new dining venue.

Named in honor of the Hale Family, the new café area will feature a warm,  welcoming seating area with wood details salvaged from Historic Farrell Library. Visitors will be able to choose from a variety of settings in which to enjoy a meal or a cup of coffee, including comfortable lounge chairs situated around a large two-sided fireplace, a feature frequently requested by students.

We look forward to sharing more photos as these spaces come to life. If you have questions about the planned space, ask them in the comments section.

And if you’d like to help make the future of Hale Library a reality, visit our Help for Hale webpage or contact Chris Spooner, KSU Foundation Associate Vice President of Development Programs, at 785-775-2130 or chriss@ksufoundation.org.

See plans for the new Hale Library!

You want of-the-moment updates? You know you can find them here on the blog!

Looking for something more? Don’t miss the latest issue of K-State Libraries Magazine.

A white hard hat, a sledge hammer, and a copy of K-State Libraries Magazine sit on a concrete background.

Our spring 2019 issue is online and in mailboxes now!

We’ve got a big-picture update on the future of Hale Library, including a sneak peek of the Dave and Ellie Everitt Learning Commons, opening fall 2019. You’ll also find dramatic renderings of the Innovation Center and working designs for new study spaces, meeting rooms and more.

 

A gray watercolor-style portrait of a woman with short hair and glasses sits next to a graphic reading "Q&A with Dean Goetsch."

Want the latest news about insurance reimbursements? In our Q&A with Dean Lori Goetsch, she shares all there is to know about insurance and the cost of renovating Hale Library.

“I never realized how complicated it would be to negotiate an insurance settlement of this magnitude,” Dean Goetsch said. “Hale Library is so large, and it was packed with furniture and technology. The insurance adjustors and all of the various parties have been working for months to estimate the costs.”

A purple and white graphic reads "Hale Library Renovation Timeline: Fall 2019, Portions of first floor complete ... etc."

And when will all of this happen? The building will reopen in phases, with the Dave & Ellie Everitt Learning Commons opening up first, in fall 2019.

At left, tall bar chairs line a cafe counter. The ceiling is covered with dark wood paneling in geometric shapes. At right, low lounge chairs flank a contemporary-style fireplace.
Old meets new in a renovated first floor café space named for the Hale Family. Additional naming opportunities exist throughout the renovated building.

Of course, Hale Library won’t live its best new life without our friends and supporters. If you like what you see in the magazine preview, visit Help for Hale to join in our effort to create a next-generation library.

An illustrated graphic of cardboard boxes and a man lifting seven blue whales reads, "Hale move-out: We moved 1105 tons of books, the equivalent of seven blue whales."

What about the books? Thanks to hundreds of workers who put in thousands of hours, more than 1.5 million collection items were packed out in less than 17 weeks. Until Hale Library is renovated, the entire collection will be stored in multiple air-conditioned warehouses across the region.

We estimate that all 1.5 million items could be clean by July 2019. Even better news: We anticipate that more than 99 percent of the materials will be saved.

Read more about the process of cleaning and storing more than 147,700 boxes of materials!

Two blonde, smiling women stand in an aisle with packed bookshelves on both sides.
Melia Fritch and Cindy Logan: professors, office mates, collaborators.

Even without the building, K-State’s librarians are working hard to elevate research on the K-State campus.

Visit the magazine to read about two librarians who have forged a unique partnership with K-State’s athletic training program. Melia Fritch and Cindy Logan don’t just help students complete assignments, they equip them to excel in their chosen professions.

A black-and-white photo of a castle-style building engulfed in flames is overlaid with text reading "50 years ago"For K-Staters of a certain age, the big campus fire isn’t Hale Library but rather Nichols Gymnasium. Did you know that after a major conflagration 50 years ago, the limestone skeleton of Nichols Gym stood unrestored for almost two decades before it became Nichols Hall? Learn more from the latest installment of K-State Keepsakes in—where else?!—our magazine!

Be the first to learn about great stories like these! Don’t miss an issue of K-State Libraries Magazine. Click here to receive a copy in your mailbox.

Wide open spaces

The walls came tumbling down on Hale Library’s first floor last week! We have even more great shots of the demolition and the dramatic progress going on behind that purple construction fence.

A light shines in a partially visible room at left, lighting up a concrete room filled with construction debris.
A light in the old vending machine alcove shines through a newly created opening in that space’s north wall.
A man and a woman wearing hard hats walk through a room with concrete floors. Three large square windows are visible at their left.
The wall at left featuring a large bank of windows blocked off the sunflower entryway from the rest of the first floor.
A man with a gray mustache wearing glasses and a white hard hat knocks a hole in a wall with a yellow-handled sledgehammer.
Associate Dean Mike Haddock did his best Wreck-It Ralph impersonation on the wall that separated the sunflower entrance from the rest of the first floor.
A petite dark-haired woman wearing glasses and a white hardhat knocks a small chunk of plaster out of the wall with a hammer.
Associate Dean Sheila Yeh takes a whack at the wall.
Four men, two on the ground and two elevated on scaffolding, are seen from behind pieces of metal framing lowering a piece of drywall to the floor.
Construction workers lower a large section of drywall and metal framing to the ground after creating an opening between the sunflower entrance doors and the rest of the first floor.
A construction worker wearing a florescent yellow shirt and white hard hat throws a crumpled chunk of metal framing on a pile.
A construction worker throws a section of metal framing on a pile of debris. They are recycling all of the materials that they can.
Two men wearing white hardhats and gloves push a cart with a large square piece of glass on it.
Two construction workers wheel out a window pane that allowed visitors at the sunflower entrance to look into the first floor but prevented them from walking into the space.
A large concrete entryway with metal and concrete pillars.
As of this week, the entire wall is gone and the sunflower entrance opens directly into the first floor. This will be the main entryway for the Dave & Ellie Everitt Learning Commons, which will open fall 2019.
In the distance, sun shines in wood and glass entryway, lighting up a dusty room filled with concrete floors and pillars
A view of the sunflower entrance from inside the first floor. Note that the alcove where the vending machines were has also been removed.

A construction worker uses a remote-controlled mini excavator to pull down duct work in front of the first floor elevators. 

The entire first floor has been opened up, and the walls that separated Einstein Bros. Bagels from the rest of the space are gone. A new cafe area named for the Hale Family will be constructed closer to the Learning Commons entrance. 
A rough yellow and gray painting of Hale Library about five feet high stretches the length of a yellow concrete block wall. A pile of bent and broken wiring conduit sits in the foreground.
When crews removed drywall from a wall behind the first floor librarian offices, they discovered a mural of Hale Library painted on the concrete block.

Three construction workers stand in a concrete room surrounded by debris on the floor in and several large trashcans.

As the space opens up, we can more clearly envision what the Dave & Ellie Everitt Learning Commons will look like. Stay tuned! Next week we’ll share drawings from the architects at PGAV so you, too, can get a glimpse of Hale Library’s first floor in its fall 2019 state!