This blog details the three-year journey to renovate Hale Library after the May 22, 2018, fire.
This blog has allowed us to share our journey of recovery with the K-State and library communities both near and far. We will never forget the generosity and outpouring of support as we worked to rebuild and create a next-generation library.
Most of Hale Library’s second floor is scheduled to open during the spring 2020 semester. We took a peek at the progress and could tell the new space is really starting to take shape!
Since there is now a direct entrance to the first floor, we are moving the second floor entrance a little further to the West. This will allow us to re-purpose some space for seating, create a better pathway to our help desks and shorten the distance of the hallway leading into the building.
When students walk into the second floor they will immediately see our new Library and IT Help desks. These two services will now be co-located providing campus with more convenience and better assistance.
Just for fun, we also took a peek inside the new cafe space on the first floor. Joyce and Joe’s Cornerstone Cafe will also open during the spring 2020 semester.
In other exciting news, we announced yesterday that the first floor Dave and Ellie Everitt Learning Commons will begin 24/5 hours starting Sun., Nov. 3. This is another service made possible by renovation efforts. We could not be more thrilled to bring this service back for K-State students. Happy studying!
We are in the thick of the fall semester, and the Dave and Ellie Everitt Learning Commons on the first floor of Hale Library has been busy with students working on projects and studying for exams. In fact, during the last few weeks the first floor has averaged more than 7,600 visits each week.
The experience of returning to Hale Library felt like coming home for those students who were at K-State before the fire.
We’re paying close attention to how students are using the new spaces to help us plan for the rest of the building. In fact, a team of librarians are conducting an assessment study. They record student use of the space multiple times each day. This data helps us understand which areas and types of furniture are the most heavily utilized. The results will impact the remaining floors.
One feature that has been a big hit with students is the abundance of whiteboards, some of which stretch from floor to ceiling.
Ah, yes. Biology 341. Perhaps no one gets as much use out of the whiteboards as these students. But, do they really need floor to ceiling whiteboards? Students like Danielle have found them useful!
The Dave and Ellie Everitt Learning Commons also includes new technology. Dozens of large monitors are spread throughout the floor that students can connect to their devices.
While students are excited about the first floor of Hale, they can’t wait to see the rest of the library. Students are looking forward to the new quiet floors that will be located on the third and fourth floors.
The second floor of Hale Library is scheduled to open during the spring semester. The rest of the building should be complete by the end of 2020. Support is still needed to for the remaining restoration and renovation of Hale Library. Donate online to the Help for Hale fund!