Things in Hale Library are starting to lighten up! Many lights are being installed throughout the building and overall, things are definitely starting to come together. Work continues on Historic Farrell Library and along with the new, modern parts of the library, the spirit of Hale Library is starting to visually come alive.
Firstly though, we wanted to address that we’ve received questions regarding the reported collapse on the third floor of the library. We want to assure the community that there was no damage to the library structure. A small section of a stairwell was being in-filled with concrete to create additional floor space on the fourth floor and during the process, the form system became unstable and fell to the floor below.
That event aside, work continues in a very positive direction and we’re excited to share with you our latest photos from the building interior.
The scaffolding in the Great Room has been completely removed and workers are using lifts to install new lights throughout the ceiling. A few of the workmen mentioned they almost wish the scaffolding was still there, since the ceiling is so high! Now that the scaffolding is out of the way, the crew is also working on removing boards from the windows and repairing plaster along the walls.
The new purple soft lighting can be seen in multiple spots near the ceiling around the second floor, including near the lobby area and printers, above the help desks and along a section of the study area. Some of the lighting will serve as a back light for lettering; for example, lettering above the help desks and on the first floor, behind lettering for the Dave & Ellie Everitt Learning Commons.
We are extraordinary thankful to the Hutton team members for working hard to restore the library, and thrilled to be able to share frequent photo updates with the community. We want you to share the pride we have in this beautiful building!